The sophisticated steel bridge with a length of 80 m was manufactured by STREICHER Maschinenbau within a six months period in the assembly halls in Deggenau/Deggendorf and afterwards transported to Berlin by ship.
On site STREICHER Tief- und Ingenieurbau Jena has executed the corresponding thrust bearings. Thus the bridge was installed over the Berlin-Spandauer-Schifffahrtskanal in October 2020. Meanwhile the bridge for pedestrians and biker is open and at night shines in a golden gloss because of its special paintwork.
A detailed video shows the development and installation on site – „Europacity Brücke und Freitreppe Stadtplatz Berlin“