Construction of retirement homes in Karlsfeld near Munich
252 apartments with 208 underground parking spaces
Execution of concrete works
The project included the construction of supply facilities for drinking water, fire-fighting water and electricity, the laying of special-purpose pipelines and the sewage system for waste water and rainwater, as well as construction, asphalt and paving work.
Development of an industrial area with surface pavement (approx. 11,500 m²) and drainage facilities (760 m canals with a diameter up to 500 DN and rainwater retention basins with a capacity of 260 m³)
Construction phase 1: road construction and civil engineering for the development of an industrial area (about 22 hectares), connection of the industrial area to a 4-lane main road
Construction phase 2: expansion of the industrial area by 4 hectares and construction of a truck parking area